Proposal software for civil engineering firms

Civil firms write two kinds of proposals at the same time: qualifications for agency selections, and quick scope-and-fee letters for clients they already serve. ProposalXL keeps one record of your people, projects and rates behind both.

See how it works

The civil proposal workload

A civil practice’s pipeline in a typical month:

  • Agency RFQs for the design of a specific project: a roadway widening, a water main replacement, a drainage study, a park.
  • On-call qualifications to get onto an agency’s bench of firms for several years.
  • Task order proposals under on-call contracts you already hold: short letters with scope and fee, sometimes due within days.
  • Private development proposals for site civil, grading, utilities and entitlement support.
  • Additional-services letters when a project in design changes.

The first two are competitive pursuits. The last three are relationship pursuits. The same people write both, usually between their own project deadlines.

What makes civil proposals different

The team includes subconsultants

Survey, geotechnical, environmental, traffic and structural subconsultants are often part of the team the agency is scoring. Their staff and project experience go into your SOQ, and their fees into your task order proposals.

Participation goals are part of the response

Federally funded transportation contracts often carry Disadvantaged Business Enterprise goals under 49 CFR Part 26, and many local agencies set small or local business goals of their own. The response has to show who meets them and for which work.

Scope follows milestones

Civil scopes are written around 30, 60, 90 and 100 percent submittals, permitting, bidding support and construction support. A task order letter that gets the milestones and review cycles right reads like it came from a firm that has done the work before.

Experience has to match the agency

Evaluators want the same kind of project, ideally for a similar agency, delivered by the key staff you are proposing, with current PE registrations in the right state on their résumés.

How ProposalXL fits a civil practice

  • One record of people and projects. Résumés, project history and availability kept current in one place, so the team page for a drainage RFQ shows your drainage people and your drainage projects.
  • The RFQ becomes the outline. Requirements, sections and page limit become the structure of the SOQ, with an owner on each section and a check against the RFQ before it goes out. How competitive responses work.
  • Task orders from your scope library and rates. The client’s request starts the letter in your format, hours are priced at your rates, and the margin is checked before the fee is set. How fee proposals work.
  • One pipeline. Every RFQ, task order and letter in one place, with its status and next step.

Example firm and client

Alder Creek Civil holds an on-call engineering contract with the City of Port Alder. On Monday the city asks for a task order to design Phase 2 of the Harbor Street storm drain. Alder Creek’s proposal starts from the city’s email and the Phase 1 proposal, uses the scope tasks the firm already writes for storm drain design, and prices the hours at current rates. The principal reviews the scope and the margin and sends it the same week. The fee for that example is broken down on proposal letters and fee proposals.

The same month the city issues an RFQ for a separate street project. That response is organized from the RFQ itself, with the firm’s transportation staff and projects.

Questions firms ask

What is a task order proposal?

Under an on-call or IDIQ contract, a firm qualifies once and the agency then issues individual task orders for specific work. For each one, the firm sends a short proposal with scope, schedule and fee, usually priced from the rate schedule in the master agreement. They are small, frequent and often due within days.

Does it cover private development work?

Yes. The same relationship flow covers private clients such as land developers and institutions: a request comes in, and the letter, scope and fee come back in your format at your rates. Agency RFQs use the competitive flow.

Which civil disciplines does it support?

ProposalXL is set up around your firm’s own services, scope language and rates, so it follows whatever mix of transportation, water, drainage, site development or other civil work your firm does.

How is this different from a general proposal tool?

General tools manage documents. ProposalXL produces the proposal from your firm’s own records: résumés and project history for the team pages, your scope library and rates for the fee, and the solicitation itself as the outline for an SOQ.

Bring us a proposal.
We'll show you your system.

Send a recent letter, fee proposal or SOQ. In the demo we walk through how ProposalXL produces it from your templates, people and rates.